.

Tuesday, March 5, 2019

Work Measurement

The purpose of cipher step rod is to tick off the conviction it ought to translate to do a job. The problem is in the definition of ought to. Work measure analyst define this as the meter it should take an experienced and well-trained performer to perform the job in a specific and well-defined system at a speed that git be maintained both day, day after day, without undue fatigue.This meter, called standard time, can be dissever into several parts the actual elements use to perform the job the military rank factor used to determine the normal pace of these elements (the method used to determine the ought to time) and an allowance for personal time, unavoidable delays, and slowing due to fatigue. at that place are four main systems of work measurement. First, and most used, is time study, specifically, stop-watch time study.Motion picture and video cameras, computers, and various production timing devices can also be used in the place of, and in join with, the stop wa tch. The second system, work sampling, is a statistical procedure for measuring work and requires an understanding of the techniques of statistics and probability. The third system, predetermined time systems (PDT), uses sets of tables of basic motions that give birth already been normalized by experts. Thus, PDT systems do not require the analyst to station or level the measurement.Finally, there is the standard data system of work measurement which, strictly speaking, is not a measurement technique at all. Here similar elements do up of similar groups of motions from the other measurement systems are tabled and then reused as needed for subsequent products and standards. USES OF WORK criterion Work measurement is used to determine standards against which comparisons can be made for a variety of purposes.1. Wage incentives. If workers are to be paid in accordance with the amount of work accomplished rather than the amount of time expended (hourly), some means of determining an acceptable, or fair, amount of work is needed. The defrayal for work accomplished could be based on sales set and profits, but a fairer method is to establish a standard and cook up in accordance to that standard. 2. Schedules. In order to schedule work effectively and keep things running smoothly and orderly, a knowledge of expected running(a) clock is an absolute necessity. Budgets. Budgets provide needed control over funds. one and only(a) of their more important inputs is operating costs. Standards provide the expected operating times from which these costs are computed.4. Labor cost control. Labor cost is commonly a very significant percentage of the total manufacturing cost (normally from 10 to 40 percent). To control these costs, the actual costs must be compared to a standard and any deviation corrected, especially if the actual is greater than the standard. . Downtime studies. right on developed standards include reasonable allowances (extra time) for personal time , unavoidable delays, and fatigue. Both time study and work sampling can be used to determine these allowances. They can also be used on a go on basis (daily or weekly) to measure actual downtime and personal time when expressed production records are not kept and standards are not used.

No comments:

Post a Comment